A Huge New House in Paunat
The foundations
While all of our trades have taken on this project, let's focus more closely on masonry and carpentry. Here, the house takes non-standard measurements: 300m2, on two floors. The foundation is a critical point in this case.

The preparation of the foundations

Laying of the foundation blocks

The foundations completed
The bearing walls
Then come the bearing walls. For this house, it's more than 3,500 bricks that were used!

Building the walls

Building the walls

The walls are up
The exterior woodwork
Once walls are up, it is time to set up the exterior woodwork. Here again, we have impressive dimensions, with a bay window over 6m!

Installation of the exterior woodwork

The exterior woodwork once settled

The exterior woodwork once settled
External insulation
The client chose external insulation. The main advantage of this technique is that it brings near zero thermal bridges, the leading cause of heat loss.

Pieces of external insulation

Pieces of external insulation

Result once all the pieces of external insulation are in place
The plaster
Finally, we also dealt with the plaster. A not easy task, due to the large surface of the walls.

Preparation before plastering

The plastering after completion

The plastering after completion
We came back to Paunat 1 year after the work was done, to find the house more warm and welcoming than ever.

Outdoor view of the house

Outdoor view of the house

Outdoor view of the house

The kitchen

View from the entrance door, after completion

View from the entrance, during the works